Chandrayaan-3 Six Days Away From Making History


Chandrayaan-3, India’s third lunar mission, will enter lunar orbit in six days. The spacecraft will undergo significant adjustments tomorrow, between midnight and one in the morning, to slingshot the spacecraft toward the Moon. The onboard propellers will get fired during the early hour’s trans-lunar injection (TLI) movement when the spacecraft is at its nearest point to Earth, perigee, rather than its farthest point, apogee.

The exact distance between Earth and the Moon will vary depending on the day’s position. August 23 will witness an attempt to land on the Moon.

With the craft now six days from the Moon, the Chandrayaan-3 countdown is over

If successful, India will join the United States, the former Soviet Union, and China as the only nations to make a smooth landing on the Moon.

ALSO READ | India Launches its Milestone Chandrayaan-3 Mission

India’s Third Moon Mission

Chandrayaan-3, India’s third lunar mission, will enter lunar orbit in about six days. Tomorrow, between midnight and one in the morning, significant adjustments will slingshot the spacecraft toward the Moon.

The onboard propellers of the spacecraft will get fired during the early hour’s trans-lunar injection (TLI) movement when the spacecraft is at its nearest point to Earth, or perigee, rather than its farthest point, or apogee.

Why does the catapult get ejected from the perigee?

The catapult gets dismissed from perigee for what reason? The Chandrayaan-3 spacecraft orbiting the Earth in an elliptical pattern at one km/s and 10.3 km/s. The spacecraft must travel at speed to attempt the slingshot because the velocity is highest (10. 3 km/s) at perigee and lowest at apogee. The second justification is that if the mission happens at perigee, the Earth’s position must shift to move towards the Moon.

Around five to six hours before the propellers will probably fire, the pre-written and packed instructions for TL will get made available.

Chandrayaan-3 should travel 0.5 km/s faster than at Perigee post-TLI

In addition to assisting the spaceship in changing its course to start heading toward the Moon, the activation of the propellers will increase its acceleration. Chandrayaan-3 should travel at a speed that is about 0. 5 km/s faster than it did at perigee after TLI.

1.2 lakh km may get traveled in 51 hours on average. Despite having a standard distance of 3. 8 million kilometers, the precise distance on any given day will vary depending on the positions of Earth and the Moon. The span could be anywhere from 3. 6 to 4 lakh kilometers. The more vital part of Chandrayaan-3 will occur after the rocket arrives at the Moon. Isro orbited a satellite around the Moon in 2008 (Chandrayaan-1) and 2019 (Chandrayaan-2).

Isro will need to perform a series of maneuvers to lower the spacecraft’s elevation and place it in a 100 km circular orbit, where its engine section will get split from the landing component on the 17 of the approaching month. August 23 will witness an attempt to land on the Moon.

About the Chandrayaan-3

At 14:35 on Friday (09:05 GMT), July 14, the Chandrayaan-3 spacecraft— encompassed an orbiter, lander, and rover—launched from Sriharikota. India recently unveiled its third mission to the Moon. Also It will be the first to set foot near its understudied south pole. While August 23-24 will see an endeavor to land on the Moon.

If successful, India will join nations like US, Russia and China to make a smooth landing on the Moon.

One Ping

  1. Pingback: ISRO Unveils the First Moon Pictures Taken by Chandrayaan-3

Leave a Reply

Your email address will not be published. Required fields are marked *